Patent · US Active

Generating planning-level time and capacity requirement formulas for manufacturing processes

US7617015B2 · kind B2 · utility

9Cited by
37References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 21, 2006
Grant dateNov 10, 2009
Priority date
Expiry dateNov 28, 2027

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/063
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Methods, computer program products and systems are disclosed for generating a planned time duration for a manufacturing process operation defined for planning purposes that includes an aggregation of multiple defined execution operations. Electronic information is received that specifies a production demand that requires use of the manufacturing process for fulfillment. A linear approximation is electronically generated of an overall time duration measure for the defined manufacturing process planning operation. The overall time duration measure is a sum of time components comprising at least a calculated measure for a variable time component for the longest of the multiple execution operations for the received production demand, and a fixed time duration measure for one send-ahead quantity for each of the multiple execution operations that is not the longest. The generated overall time duration measure is then returned.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.