Patent · US Active

Process to improve extraction of crude oil and installation implementing such process

US7621333B2 · kind B2 · utility

4Cited by
10References
41Claims
0Family size

Assignee

Inventor

Key dates

Filing dateFeb 7, 2006
Grant dateNov 24, 2009
Priority date
Expiry dateAug 2, 2026

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B36/006
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A hydrocarbon extraction process enabling an acceleration in the production of the productive zone of the oil deposit of a well and an increase in the cumulated quantity of hydrocarbons, characterized by the fact that a hot fluid constituted of hydrocarbons is made to circulate so as to bring the productive zone locally to a higher temperature by conduction in order to fluidify the hydrocarbons imprisoned in an underground reservoir, by means of a thermally-insulated pipe, the hot fluid being mixed with the hydrocarbons extracted via a liner or drain in the productive zone such mixture thus formed being recovered at the surface by means of an pumping pipe.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.