Real-time predictive time-to-completion for variable configure-to-order manufacturing
US7647130B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 5, 2006 |
| Grant date | Jan 12, 2010 |
| Priority date | — |
| Expiry date | Jul 16, 2027 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/30
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Predicting a completion time for the manufacturing of an ordered configuration of a product based on actual completion times and self adjusting prediction completion times. An order is received to manufacture a particular configuration of a product. Multiple activities are identified that need to be finished in order to complete the manufacturing of the configuration. A completion time that the configuration will be manufactured is predicted based on actual completion times and self-adjusting predicted completion times for the activities.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.