Patent · US Active

Supply chain management system determining whether orders related to a family of products can be promised

US7668762B2 · kind B2 · utility

1Cited by
12References
80Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 5, 2003
Grant dateFeb 23, 2010
Priority date
Expiry dateJul 5, 2027

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/0875
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A supply chain management system processing orders related to a family of products. An user may provide a parameter referred to as ‘aggregate time fence’ (ATF) duration representing an amount of advance time duration after which aggregate supply of all member items is available to satisfy the demand for any member item. For illustration, if an order for a member item is received with a required date being after the ATF duration, the order can be promised even if the required quantity of the first member item is not scheduled to be available at of the required date, provided sufficient number of units of other member items are scheduled to be available as of the requested date. Thus, orders are promised taking advantage of similarities in resource requirements of member items.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.