Method for controlling water influx into wellbores by blocking high-permeability channels
US7677313B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 13, 2005 |
| Grant date | Mar 16, 2010 |
| Priority date | — |
| Expiry date | Nov 27, 2025 |
Classification
- Technology area (CPC C)Chemistry; Metallurgy
- CPC primaryC09K8/512
- WIPO fieldBasic materials chemistry
- WIPO sectorChemistry
Abstract
A method of blocking a high permeability channel in communication with a wellbore, including the steps of introducing an amount of an unreinforced gel into the high permeability channel via the wellbore and introducing an amount of a reinforced gel comprising an amount of a reinforcing material into the high permeability channel via the wellbore. The method may further include the step, after introducing the unreinforced gel and the reinforced gel into the high permeability channel, of introducing an amount of a chaser fluid into the wellbore.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.