Patent · US Active

Optimized deployment of parts in a supply chain network

US7685015B2 · kind B2 · utility

3Cited by
20References
45Claims
0Family size

Assignee

Inventors

Key dates

Filing dateFeb 15, 2008
Grant dateMar 23, 2010
Priority date
Expiry dateFeb 15, 2028

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/20
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Locations that include supply, manufacturing, demand locations, and channels are defined. A demand is computed for each part at each location. An availability lead-time is estimated for each part at each location and for each part at each channel. A total landed cost is calculated for each part at each location and each channel. A lead-time demand is computed for each part at each location using the availability lead-times for the part. A demand over lead-time is computed for each part at each location using the availability lead-times for the part. A completely filled demand is determined from the lead-time demands and the stock levels, and a partially filled demand is determined from the lead-time demands and the stock levels. A coverage function is generated for the parts at the locations and the channels from the completely filled demand and the partially filled demand.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.