Patent · US Active

Method for enhancing production allocation in an integrated reservoir and surface flow system

US7752023B2 · kind B2 · utility

23Cited by
6References
8Claims
0Family size

Assignee

Inventor

Key dates

Filing dateOct 31, 2007
Grant dateJul 6, 2010
Priority date
Expiry dateOct 31, 2027

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for enhancing allocation of fluid flow rates among a plurality of wellbores coupled to surface facilities is disclosed. The method includes modeling fluid flow characteristics of the wellbores and reservoirs penetrated by the wellbores. The method includes modeling fluid flow characteristics of the surface facilities. An optimizer adapted to determine an enhanced value of an objective function corresponding to the modeled fluid flow characteristics of the wellbores and the surface facilities is then operated. The objective function relates to at least one production system performance parameter. Fluid flow rates are then allocated according to the optimization.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.