Personnel risk management system and methods
US7783500B2 · kind B2 · utility
18Cited by
12References
21Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Feb 28, 2005 |
| Grant date | Aug 24, 2010 |
| Priority date | — |
| Expiry date | Apr 19, 2029 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q30/02
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A method and system for providing expatriate risk management are disclosed. The method includes receiving intelligence from at least one intelligence source, receiving asset information, and generating a risk assessment report based on the intelligence and an employee profile.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.