Patent · US Expired

Generalized well management in parallel reservoir simulation

US7809537B2 · kind B2 · utility

34Cited by
4References
16Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 15, 2004
Grant dateOct 5, 2010
Priority date
Expiry dateOct 23, 2025

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q50/06
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A computer-implemented process simulates production of oil and gas from hydrocarbon reservoirs. The process is used to help forecast the optimal future oil and gas recovery from large hydrocarbon reservoirs. At the same, this process is flexible to allow for further addition of new options; robust and reliable; and easy to use. The process is also comprehensive in that it allows a forecast of future performance of a wide range of reservoirs and future operation scenarios. By using the high-resolution models provided, a reservoir can be described much more accurately.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.