Generalized well management in parallel reservoir simulation
US7809537B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 15, 2004 |
| Grant date | Oct 5, 2010 |
| Priority date | — |
| Expiry date | Oct 23, 2025 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q50/06
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A computer-implemented process simulates production of oil and gas from hydrocarbon reservoirs. The process is used to help forecast the optimal future oil and gas recovery from large hydrocarbon reservoirs. At the same, this process is flexible to allow for further addition of new options; robust and reliable; and easy to use. The process is also comprehensive in that it allows a forecast of future performance of a wide range of reservoirs and future operation scenarios. By using the high-resolution models provided, a reservoir can be described much more accurately.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.