Patent · US Active

Schedule management apparatus, schedule management method and program

US7818197B2 · kind B2 · utility

10Cited by
5References
14Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 30, 2005
Grant dateOct 19, 2010
Priority date
Expiry dateAug 18, 2029

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/1097
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A context estimation rule is applied to spare time on a user's schedule, and contexts are estimated. On the basis of a task template, an input task is divided into plural subtasks. A task recommendation rule for recommending tasks to do from the relation between contexts and metadata of tasks is applied to the spare time of the user, and tasks to do in the spare time are recommended on the basis of the contexts of the spare time and the metadata of the subtasks. The recommended tasks are managed as schedules.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.