Patent · US Expired

Method and system for scenario and case decision management

US7835893B2 · kind B2 · utility

33Cited by
24References
27Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 3, 2003
Grant dateNov 16, 2010
Priority date
Expiry dateJun 8, 2025

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/06
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A system and method may be configured to support the evaluation of the economic impact of uncertainties associated with the planning of a petroleum production project, e.g., uncertainties associated with decisions having multiple possible outcomes and uncertainties associated with uncontrollable parameters such as rock properties, oil prices, etc. The system and method involve receiving user input characterizing the uncertainty of planning variables and performing an iterative simulation that computes the economic return for various possible instantiations of the set of planning variables based on the uncertainty characterization. The system and method may (a) utilize and integrate highly rigorous physical reservoir, well, production flow, and economic models, and (b) provide a mechanism for specifying constraints on the planning variables. Furthermore, the system and method may provide a case manager process for managing multiple cases and associated “experimental runs” on the cases.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.