Patent · US Active

Real-time operating optimized method of multi-input and multi-output continuous manufacturing procedure

US7848831B2 · kind B2 · utility

3Cited by
1References
9Claims
0Family size

Inventor

Key dates

Filing dateDec 27, 2005
Grant dateDec 7, 2010
Priority date
Expiry dateFeb 16, 2027

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG05B2219/32015
  • WIPO fieldControl
  • WIPO sectorInstruments

Abstract

A real-time operating optimized method of multi-input and multi-output continuous manufacture procedure includes steps as follows: first, using plurality of pivotal operation conditions in the manufacture procedure as optimized variables, and using the technical target associating with the pivotal operation conditions as the objective function, then, calculating on line the grades vector between pivotal operation conditions and the technical target at current time according to historical data of pivotal operation conditions and the technical target, using correlation integral method or other methods, at last, using this grades vector to define the adjustment direction of the operation conditions. When the grades vector is positive or negative, the pivotal operation conditions should be adjusted in order to change the grades vector to zero.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.