System and method for optimizing production in a well
US7849920B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 20, 2007 |
| Grant date | Dec 14, 2010 |
| Priority date | — |
| Expiry date | Apr 30, 2028 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/14
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
For optimizing well production, intervals are selected along a deviated wellbore, and a well test and treatment string is deployed in the wellbore. Each interval is then isolated to enable performance of desired testing. The test data obtained is evaluated to determine an appropriate remedial action which is then implemented via the well test and treatment string. The system and method enable the testing and treatment of a plurality of intervals along a horizontal well during the same run downhole.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.