Patent · US Active

Risk shifting method for investments in wind power generation

US7853461B2 · kind B2 · utility

0Cited by
1References
28Claims
0Family size

Inventor

Key dates

Filing dateFeb 19, 2008
Grant dateDec 14, 2010
Priority date
Expiry dateJun 12, 2029

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S10/50
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Systems and methods for shifting risk in investments in wind power generation are disclosed herein. In some embodiments, methods for shifting at least a portion of an investment risk in a wind power generation project include calculating a return floor amount associated with the wind power generation project, accepting a premium payment amount from an investor in the wind power generation project, and for each of an agreed period within an agreed term, paying the investor a difference between the return floor amount and a realized amount if the return floor amount is greater than the realized amount.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.