Large scale supply planning
US7856287B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 19, 2009 |
| Grant date | Dec 21, 2010 |
| Priority date | — |
| Expiry date | May 19, 2029 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/087
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A production planning technique inputs demands for products. Each of the demands having multiple due dates, and the multiple due dates having different priorities. An explosion process utilizing linear programming and heuristics is performed to identify demands for components that are used to make the products (the explosion process maintains the multiple due dates and corresponding priorities for the components) and performs an implosion process utilizing linear programming and heuristics to assign resources to the components considering the multiple due dates and corresponding priorities.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.