Patent · US Active

Pull planning for unserviceable parts in connection with on-demand repair planning

US7856371B2 · kind B2 · utility

0Cited by
15References
28Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 6, 2008
Grant dateDec 21, 2010
Priority date
Expiry dateDec 2, 2028

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/20
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

In one embodiment, planning repairs in response to demand in a multi-level repair network includes accessing a forecasted demand for serviceable parts at a repair location and, for each inspected unserviceable part at the location that is not repairable at the location: (1) planning a move of the part to an upstream repair location such that the part can be available for repair at the upstream location at an estimated earliest time; (2) estimating a latest time at which a repair of the part can begin at the upstream location to help satisfy the forecasted demand, according to the forecasted demand and the estimated earliest time, and planning a repair at the upstream location at the estimated latest time; and (3) re-planning the move, according to the start time of the repair, by modifying a move delivery time according to a repair start time and modifying a move start time according to the modified delivery time. The re-planned move start time is an estimated latest time at which the part can be moved to the upstream location for repair to help satisfy the forecasted demand.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.