Constraint-based production planning and scheduling

US7860737B2 · kind B2 · utility

12Cited by
15References
12Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 2, 2003
Grant dateDec 28, 2010
Priority date
Expiry dateFeb 3, 2028

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q99/00
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

The present invention is a constraint-based planning tool that specifically addresses the needs of complex discrete and process industries by providing a computationally efficient method and system for fulfillment of customer orders in a supply chain. By comprehensively synchronizing and optimizing the flow of materials through the enterprise, the present invention creates a feasible plan for manufacturing operations that simultaneously optimizes both material and capacity constraints by planning and scheduling multiple customer orders, planning for use the various resources located in remote locations needed to fulfill such orders, and scheduling the used resources for replenishment at appropriate times so that the resources meet the needs of the orders.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.