Divided job scheduler
US7872769B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 9, 2005 |
| Grant date | Jan 18, 2011 |
| Priority date | — |
| Expiry date | Mar 9, 2028 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F3/1285
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
In a computer system including a job scheduler which divides an input job and determines a client apparatus to assign the divided job, and a task manager which transmits the divided job to the client apparatus determined by the job scheduler, the job scheduler assigns the same job to a plurality of client apparatuses when the number of client apparatuses is larger than the number of divided jobs, and when the job is finished in one of the plurality of client apparatuses assigned the same job, execution of the job in the remaining client apparatuses is canceled so that the time until all jobs are finished is shortened.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.