Patent · US Active

Structural transformation of execution-level manufacturing process routings into planning-level routings

US7894922B2 · kind B2 · utility

4Cited by
43References
10Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 21, 2006
Grant dateFeb 22, 2011
Priority date
Expiry dateFeb 20, 2028

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/02
  • WIPO fieldControl
  • WIPO sectorInstruments

Abstract

Computer-implemented methods, and associated computer program products and systems, are disclosed for generating electronic data for use in planning the execution of a manufacturing process. The methods, generally, are used in the structural transformation of execution-level routings for manufacturing processes into planning-level routings. The methods applies various transformation techniques when a planning-level routing includes alternative paths, and different transformation techniques when a planning-level routing includes parallel paths. Planning modes are created in the case of alternative paths, and parallel paths generally do not cause multiple modes to be created. Parallel and alternative paths in a planning-level operation also has impacts on how the a planned duration formula is determined.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.