Patent · US Active

System and method for injection into a well zone

US7896079B2 · kind B2 · utility

17Cited by
19References
19Claims
0Family size

Assignee

Inventors

Key dates

Filing dateFeb 27, 2008
Grant dateMar 1, 2011
Priority date
Expiry dateAug 31, 2028

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/20
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A technique facilitates a water flood, e.g. dump flood, operation. A standard electric submersible pumping system is deployed in a wellbore to draw water from an aquifer or water source zone along the wellbore. A shroud and a crossover port are used in combination with the submersible pumping system to redirect pumped water downwardly along an isolated flow path. The downward flow of pumped water is directed along the wellbore and injected into a desired, injection zone to facilitate recovery of oil or to perform other types of water flood operations.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.