Method and system for treating a subterranean formation using diversion
US7934556B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 21, 2007 |
| Grant date | May 3, 2011 |
| Priority date | — |
| Expiry date | Jul 29, 2027 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/25
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A method well treatment includes establishing fluid connectivity between a wellbore and at least one target zone for treatment within a subterranean formation, which is intersected by a wellbore. The method includes deploying coiled tubing into the wellbore and introducing a treatment composition into the wellbore. The method includes contacting a target zone within the subterranean formation with the treatment composition, introducing a diversion agent through the coiled tubing to an interval within a wellbore and repeating the introduction of the treatment, the contacting of the target zone and the introduction of the diversion agent for more than one target zone.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.