Patent · US Active

Dynamic job processing based on estimated completion time and specified tolerance time

US7937705B1 · kind B1 · utility

25Cited by
18References
13Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 9, 2006
Grant dateMay 3, 2011
Priority date
Expiry dateJan 20, 2030

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2209/5014
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

The invention provides a system and method for managing clusters of parallel processors for use by groups and individuals requiring supercomputer level computational power. A Beowulf cluster provides supercomputer level processing power. Unlike a traditional Beowulf cluster; however, cluster size in not singular or static. As jobs are received from users/customers, a Resource Management System (RMS) dynamically configures and reconfigures the available nodes in the system into clusters of the appropriate sizes to process the jobs. Depending on the overall size of the system, many users may have simultaneous access to supercomputer level computational processing. Users are preferably billed based on the time for completion with faster times demanding higher fees.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.