Model based real-time optimization of fuel cell clusters
US7951496B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 18, 2007 |
| Grant date | May 31, 2011 |
| Priority date | — |
| Expiry date | Dec 4, 2029 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E60/50
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
A power generation system is provided. The power generation system includes a fuel cell controller, at least one fuel cell cluster operably connected to the fuel cell controller and a data server operably connected to the fuel cell cluster. The data server is configured to obtain operational data from the fuel cell cluster. In addition, a model server operably connected to the data server. The model server is configured to model the operational characteristics of the fuel cell cluster during the actual operation of the fuel cell cluster and modify the operation of the fuel cell cluster in real-time, based on the operational data obtained by the data server.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.