Enhanced statistical measurement analysis and reporting
US7971181B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 14, 2006 |
| Grant date | Jun 28, 2011 |
| Priority date | — |
| Expiry date | Aug 12, 2030 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/10
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Project information relating to a project is received, the project information identifying a project type, an authorized write entity, and an authorized approval entity, and a valid metric is selected based at least on the project type, the valid metric measuring an aspect of performance of the project. Base measures corresponding to the valid metric are received from the authorized write entity, the base measures further including periodic base measures corresponding to at least one metric period, and aperiodic base measures corresponding to an aperiodic incident, and the valid metric is calculated based on the base measures. The base measures are sorted into excluded base measures and non-excluded base measures, organizational baseline data is imported, and an organizational indicator is calculated based on the non-excluded base measures and the organizational baseline data.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.