System and method for business object sync-point and rollback framework
US7984020B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 6, 2007 |
| Grant date | Jul 19, 2011 |
| Priority date | — |
| Expiry date | Aug 5, 2029 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F9/466
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A method and system for allowing a rollback within a multi-object system infrastructure are provided. In embodiments, a rollback to a state of a software business object is effected. A sync point manager maintains, for example, a list of sync points and their respective associated identifiers and relationship data. When under sync point protection, i.e., a sync point is set, each subsequent object, when created, is requested to prepare a buffer associated with the specific sync point, so that if an error occurs, a request to rollback to the state associated with the sync point is effectable. Multiple sync points may be kept track of by the sync point manager. In further embodiments, the sync points may be associated with a variety of different types of objects.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.