Method for identifying risks for dependent projects based on an enhanced telecom operations map
US8005706B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 3, 2007 |
| Grant date | Aug 23, 2011 |
| Priority date | — |
| Expiry date | Dec 3, 2029 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q50/60
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A method is provided for risk management in project management. A risk is identified for a project during a concept phase for the project prior to an analysis phase for the project. A probability for an identified risk and an impact severity for the identified risk are analyzed to determine a risk exposure for the project. A risk response plan is developed based on the risk exposure. The risk exposure is mitigated by executing a portion of the risk response plan.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.