Patent · US Active

Method for identifying risks for dependent projects based on an enhanced telecom operations map

US8005706B1 · kind B1 · utility

9Cited by
19References
16Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 3, 2007
Grant dateAug 23, 2011
Priority date
Expiry dateDec 3, 2029

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q50/60
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A method is provided for risk management in project management. A risk is identified for a project during a concept phase for the project prior to an analysis phase for the project. A probability for an identified risk and an impact severity for the identified risk are analyzed to determine a risk exposure for the project. A risk response plan is developed based on the risk exposure. The risk exposure is mitigated by executing a portion of the risk response plan.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.