Patent · US Active

Transition channel between two turbine stages

US8011879B2 · kind B2 · utility

4Cited by
3References
12Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 5, 2007
Grant dateSep 6, 2011
Priority date
Expiry dateDec 22, 2029

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02T50/60
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A transition channel between a first turbine section and a second turbine section for a gas turbine engine is disclosed. The channel includes a first radially external annular wall including ring sector elements housed inside an annular ring and orifices for injecting a fluid into the channel in order to re-energize the boundary layer thereof, a second radially internal annular wall, and a fluid supply device arranged between the space outside the ring and the injection orifices.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.