Patent · US Active

System and method for handling a dependency between two product segments of a process modeling a production system

US8032243B2 · kind B2 · utility

6Cited by
4References
2Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 24, 2008
Grant dateOct 4, 2011
Priority date
Expiry dateJul 20, 2029

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/02
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A system for handling a dependency between two product segments of a process modeling a production system within a manufacturing execution system (MES) includes a network and a production modeler. The network has data processing units running a MES software for controlling and/or monitoring a production process operating a production components. The production modeler within the MES software defines the dependency between the two product segments, and allows modeling the dependency in a graphical environment as a link between the two product segments. The link is selected from a tool box having link types, each defining one of predetermined dependencies, such as: the two product segments run in parallel, one of the product segments starts after end of the other product segment, one of the product segments starts with a predetermined delay after the other product segment has been started, both two product segments use an identical equipment.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.