Methods and systems for a multi-level scheduling framework

US8073722B2 · kind B2 · utility

2Cited by
4References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 30, 2004
Grant dateDec 6, 2011
Priority date
Expiry dateJan 21, 2029

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q50/188
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A method for providing a planning framework for use in managing a project to be planned in a supply chain, comprising providing a first software layer for storing and manipulating planning data relative to the planning project; providing a second software layer for communicating with the first software layer, the second layer arranged for pre processing, preparing and post processing a predetermined planning method. By such a multilayered framework, the invention is able to execute a planning algorithms to solve multi-level planning problems, wherein generic modules can be executed as fast modules in an environment that is highly optimized in terms of load on time and system resources and specifically adapted modules are embodying a particular planning strategy that can operate on a different level that is highly flexible.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.