US8082218B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 21, 2007 |
| Grant date | Dec 20, 2011 |
| Priority date | — |
| Expiry date | Dec 30, 2029 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F9/44552
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Conflicts among programs are detected, and advice is given based on the detected conflicts. A set of conflict rules defines what constitutes a conflict, and a set of advice rules defines what advice is to be given in response to a conflict that has been detected. The conflict rules may be provided by a different party from the action rules, so the decision as to what constitutes a conflict can be made separately from the decision as to what advice should be given when a conflict is detected.