Scheduling data delivery to manage device resources
US8090826B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 27, 2008 |
| Grant date | Jan 3, 2012 |
| Priority date | — |
| Expiry date | Dec 4, 2028 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02D10/00
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Managing power-consuming resources on a first computing device by time-based and condition-based scheduling of data delivery from a plurality of second computing devices. A scheduler executing on the first computing device has knowledge of recurrent schedules for activation by the second computing devices. The first computing device determines availability of the power-consuming resources and adjusts an activation time for the schedules to use the power-consuming resources when the resources are available. Managing the schedules associated with the second computing devices preserves battery life of the first computing device.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.