Patent · US Active

Operation simulation system for plant construction

US8095346B2 · kind B2 · utility

4Cited by
5References
5Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 14, 2009
Grant dateJan 10, 2012
Priority date
Expiry dateDec 6, 2029

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q50/08
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

An operation simulation system for plant construction, having operating expense calculated based on crane type determined by a command input; the expense to construct foundation calculated based on the foundation placement on which the determined crane is put; the operating expense calculated based on a period during which an operation is carried out; the expense to temporarily place the installation object calculated based on the specifications of the installation object before the installation; the installation operation expense calculated based on an installation milestone reflecting a due date of the installation object; the total necessary expense calculated based on all the expenses calculated; the total necessary expense is analyzed and evaluated; and the command input is adjusted by reflecting the results of an evaluation analysis so that the value of the command input falls in range of the set values in the specifications held by the corresponding setting apparatus.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.