Plan solver
US8121885B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Apr 13, 2009 |
| Grant date | Feb 21, 2012 |
| Priority date | — |
| Expiry date | Apr 24, 2030 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q30/0202
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Systems and methods for supply chain management and identification of feasible plans. Identification of feasible plans includes simultaneous breadth and depth satisfaction of demands. Demands are satisfied using multiple sources of supply, consideration of substitute items, generation of supply, and/or reallocation of supply previously pegged for satisfaction of a lower priority demand. Reallocation optionally includes consideration of items and demands associated with multiple level codes.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.