Systems and methods for staged deployment of software
US8135775B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | May 29, 2008 |
| Grant date | Mar 13, 2012 |
| Priority date | — |
| Expiry date | Nov 25, 2028 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F8/61
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
At least one node in the network is assigned to a first deployment group and at least one other node in the network is assigned to a second deployment group. A set of distribution criteria specifies a triggering event which must occur before a software package is deployed to the second deployment group. The software package is deployed to at least one node within the first deployment group. Distribution of the software package to at least one node within the second deployment group is deferred until after the triggering event has occurred.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.