Patent · US Active

Pre-scheduling the timelines of virtual machines

US8140668B2 · kind B2 · utility

0Cited by
0References
15Claims
0Family size

Assignee

Inventor

Key dates

Filing dateJun 24, 2009
Grant dateMar 20, 2012
Priority date
Expiry dateFeb 4, 2030

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/5077
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A host controller pre-schedules the timelines of virtual machines that run on a host cluster. In one embodiment, the host controller uses a plurality of timers to determine the start times of the virtual machines. The host controller starts the virtual machines on the host cluster over a time span according to the configurable timelines recorded in the timers. The start times of the virtual machines can be spread over the time span to prevent a load spike at any particular time instance. The virtual machines are up and running on the hosts by a pre-determined time to provide virtual desktops to remote clients. The timers may be configured as a calendar.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.