Method for generating data of plant construction simulation and system thereof
US8155928B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jan 15, 2009 |
| Grant date | Apr 10, 2012 |
| Priority date | — |
| Expiry date | Aug 30, 2030 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q30/0201
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A scheduling system and a CAD system are used to prepare a construction plan in plant construction simulation. A construction work managed by the scheduling system and a plant part used in the construction work and managed by the CAD system, are managed in association with each other. When the plant part is broken down into a plurality of lower plant parts constituting the plant part, as a plurality of lower construction works of the construction work, the processing for associating the lower plant parts with the lower construction works is performed. Data for mutually associating the construction works and the plant parts based on the processing is generated. The generated data is used to mutually link the scheduling system and the CAD system, and a situation in which appropriate parts are installed as progress of the construction work, is displayed.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.