Project management applications utilizing summary tasks for top-down project planning

US8160911B2 · kind B2 · utility

8Cited by
14References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 19, 2009
Grant dateApr 17, 2012
Priority date
Expiry dateJul 21, 2030

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/063116
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Embodiments of the present invention are directed toward providing a method utilizing project management software for creating a project plan utilizing a top-down strategy allowing a user to describe high-level objectives before filling in details for the underlying tasks of which the high-level objectives are comprised. As an alternative to basing summary task dates and durations solely on subtask data, the present invention allows a user to enter dates and duration values into summary tasks regardless of when the corresponding subtasks occur. By utilizing a top-down project management approach, embodiments of the present invention promote utilizing summary tasks as a starting point of project planning. Users are able to input high-level objectives of a project when more specific details of subtasks are unknown. Because summary task data is not rolled-up from the subtask data, a user may specify details such as dates and durations of subtasks at a later time.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.