Patent · US Active

Planning and scheduling tool assistant assuring high utilization of resources

US8209205B1 · kind B1 · utility

4Cited by
7References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 24, 2004
Grant dateJun 26, 2012
Priority date
Expiry dateMar 10, 2032

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/80
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Schedulers, Planners, and Maintenance Supervisors in an Industrial facility can use the user interface of the present invention to extremely quickly move work order schedules, status planning, and manage resources. Additionally, key performance indicators or metrics on performance on how well the organization is doing is also cumbersome if not impossible in the current practice in these industrial organizations. The variables of this management include worker, crew, Work Order, Dates, Planning Status, planner, dates, etc. (see tech manual and summary sheets). The invention operates by interfacing with the Computerized Maintenance Management System (CMMS) database in a thoroughly interactive process. The local program constructs a parallel database and reads and feedbacks to the CMMS database frequently to stay current and accurate.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.