Planning and scheduling tool assistant assuring high utilization of resources
US8209205B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | May 24, 2004 |
| Grant date | Jun 26, 2012 |
| Priority date | — |
| Expiry date | Mar 10, 2032 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/80
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Schedulers, Planners, and Maintenance Supervisors in an Industrial facility can use the user interface of the present invention to extremely quickly move work order schedules, status planning, and manage resources. Additionally, key performance indicators or metrics on performance on how well the organization is doing is also cumbersome if not impossible in the current practice in these industrial organizations. The variables of this management include worker, crew, Work Order, Dates, Planning Status, planner, dates, etc. (see tech manual and summary sheets). The invention operates by interfacing with the Computerized Maintenance Management System (CMMS) database in a thoroughly interactive process. The local program constructs a parallel database and reads and feedbacks to the CMMS database frequently to stay current and accurate.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.