Apparatus and method for predicting vertical stress fields
US8214152B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 28, 2009 |
| Grant date | Jul 3, 2012 |
| Priority date | — |
| Expiry date | Sep 30, 2030 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG01V11/00
- WIPO fieldMeasurement
- WIPO sectorInstruments
Abstract
A method of estimating at least one of stress and pore fluid pressure in an earth formation is disclosed. The method includes: discretizing a domain including at least a portion of the earth formation into a plurality of cells, each cell including a respective density value; dividing the domain into a first region and a second region, the first region including a surface of the earth formation; vertically integrating the respective density values in the first region; and estimating the total vertical stress for each cell in the first region and the second region by estimating a point load based on the respective density value.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.