Enhanced project management tool
US8224472B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 16, 2008 |
| Grant date | Jul 17, 2012 |
| Priority date | — |
| Expiry date | Nov 11, 2030 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06313
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.