Patent · US Active

Method for managing production from a hydrocarbon producing reservoir in real-time

US8244509B2 · kind B2 · utility

19Cited by
42References
30Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJul 30, 2008
Grant dateAug 14, 2012
Priority date
Expiry dateApr 21, 2030

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

The invention relates to a method of performing an oilfield operation of an oilfield having at least one wellsite, each wellsite having a wellbore penetrating a subterranean formation for extracting fluid from an underground reservoir therein. The method steps include obtaining a plurality of real-time parameters from a plurality of sensors disposed about the oilfield, wherein the plurality of real-time parameters comprise at least one selected from a group consisting of real-time flow rate data and real-time pressure data of the wellbore, configuring a gridless analytical simulator for simulating the underground reservoir based on the plurality of real-time parameters, generating real-time simulation results of the underground reservoir and the at least one wellsite in real-time using the gridless analytical simulator, and performing the oilfield operation based on the real-time simulation results.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.