Patent · US Active

Non-destructive element splitting using location-based construction planning models

US8244569B2 · kind B2 · utility

2Cited by
7References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 3, 2008
Grant dateAug 14, 2012
Priority date
Expiry dateMay 3, 2031

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/06
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A system for location-based management of construction is provided. A plurality of location systems generate one or more locations where construction activities associated with one or more elements in each location can be performed. A construction activity location system associates each of a plurality of construction tasks with one of the locations. An element splitting system receives an element selection and associates one or more construction tasks of the element with two or more locations. A construction activity association system associates one or more of the plurality of construction tasks with one or more of the other construction tasks. A construction sequence system generates a sequence of construction tasks based on the layer associated with each construction task and based on the other construction tasks associated with each construction task.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.