Patent · US Active

Optimizing power consumption by tracking how program runtime performance metrics respond to changes in operating frequency

US8261112B2 · kind B2 · utility

10Cited by
1References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 8, 2008
Grant dateSep 4, 2012
Priority date
Expiry dateDec 7, 2030

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method, system, and computer program product for optimizing power consumption of an executing processor executing. The method includes determining a first sensitivity relationship (SR) based on a first and a second performance metric value (PMV) measured at a first and second operating frequency (OF), respectively. The first SR predicts workload performance over a range of OFs. A third OF is determined based on the first SR and a specified workload performance floor. A third PMV is measured by executing the processor operating at the third OF. A second SR based on the second and third PMVs is then determined. The first and second SRs are logically combined to generate a third SR. Based on the third SR, a fourth OF is outputted.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.