Operation method of flash smelting furnace and raw material supply apparatus
US8287801B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 24, 2010 |
| Grant date | Oct 16, 2012 |
| Priority date | — |
| Expiry date | Sep 24, 2030 |
Classification
- Technology area (CPC C)Chemistry; Metallurgy
- CPC primaryC22B23/025
- WIPO fieldMaterials, metallurgy
- WIPO sectorChemistry
Abstract
An operation method of a flash smelting furnace includes blowing a gas for dispersing raw material and contributing to a reaction, from a lance at an upper portion of a shaft so that the gas forms a spiral flow. A raw material supply apparatus includes a supply portion supplying raw material and a gas for dispersing the raw material and contributing to a reaction into a flash smelting furnace, wherein the supply portion has a lance provided at an upper portion of a shaft that blows the gas so that the gas forms a spiral flow.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.