Method of building a hybrid tower for a wind generator
US8297025B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Apr 4, 2011 |
| Grant date | Oct 30, 2012 |
| Priority date | — |
| Expiry date | Apr 28, 2031 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E10/728
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
In the method of building a hybrid tower, a metal mast is erected and connected to a foundation and a concrete structure having a plurality of superimposed concrete segments is built around the metal mast by using the metal mast as a support. Afterwards, the metal mast is disconnected from the foundation and lifted by telescoping and guiding the metal mast along concrete structure. Finally, the lifted metal mast is connected to the concrete structure. Building of the concrete structure comprises: (a) installing at least one first segment of the concrete structure; (b) lifting the installed segment(s) of the concrete structure along the metal mast by guiding the lifted segments of the concrete structure using the metal mast, so as to clear a space having a sufficient height to receive a next segment of the concrete structure; (c) installing the next segment of the concrete structure in said space; and (d) repeating steps (b) and (c) until a last segment of the concrete structure is installed at a bottom part of the concrete structure.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.