Project engineering workflow and tracking integration
US8306887B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Jan 6, 2010 |
| Grant date | Nov 6, 2012 |
| Priority date | — |
| Expiry date | Jan 22, 2031 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q40/00
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A system is provided comprising a computer, project forecast, workflow allocations, and incurred expense databases, and an application on the computer extracting from the project forecast database a list of costs and revenues associated with a first and second project, costs comprising approved expenses described in the workflow allocations database and incurred expenses in the incurred expense database. The system determines the first project is operational and for a first subscriber base and the second project is incomplete and is to be for a second subscriber base, completion of the second project pending release of a remaining cost item. The system analyzes an alternate allocation of the cost item to improve the profitability of the first subscriber base, delaying the second project. The system determines the proposed alternate allocation increases the first subscriber base profitability more than a reduction of second subscriber base profitability resulting from the proposed alternate allocation.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.