Patent · US Active

Method and system for increasing production of a reservoir

US8347959B2 · kind B2 · utility

8Cited by
8References
21Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 3, 2008
Grant dateJan 8, 2013
Priority date
Expiry dateFeb 25, 2030

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/26
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for stimulating production of a first wellbore associated with a reservoir. The method includes determining a textural complexity of a formation in which the reservoir is located, determining an induced fracture complexity of the formation using the textural complexity, determining a first operation to perform within the formation to maintain conductivity of the formation based on the induced fracture complexity and the textural complexity, performing the first operation within the formation, and fracturing the formation to create a first plurality of fractures.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.