Workload-guided application scheduling in multi-core system based at least on applicaton branch transition rates
US8359597B1 · kind B1 · utility
Inventors
Key dates
| Filing date | Sep 11, 2009 |
| Grant date | Jan 22, 2013 |
| Priority date | — |
| Expiry date | Jul 8, 2031 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F9/5044
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
The proposed method exploits inherent characteristics of a software program to select a core of a multi-core processor for executing the software program. Each characteristic is associated with a suitability metric, which measures the degree of the match between that characteristic and the corresponding hardware configuration. In one embodiment, fuzzy logic is used to combine individual metrics to produce an overall suitability that indicates the overall degree of the match between a program and a core.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.