Patent · US Active

Workload-guided application scheduling in multi-core system based at least on applicaton branch transition rates

US8359597B1 · kind B1 · utility

6Cited by
4References
18Claims
0Family size

Inventors

Key dates

Filing dateSep 11, 2009
Grant dateJan 22, 2013
Priority date
Expiry dateJul 8, 2031

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/5044
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

The proposed method exploits inherent characteristics of a software program to select a core of a multi-core processor for executing the software program. Each characteristic is associated with a suitability metric, which measures the degree of the match between that characteristic and the corresponding hardware configuration. In one embodiment, fuzzy logic is used to combine individual metrics to produce an overall suitability that indicates the overall degree of the match between a program and a core.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.