Well prog execution facilitation system and method
US8386059B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | Dec 22, 2010 |
| Grant date | Feb 26, 2013 |
| Priority date | — |
| Expiry date | May 11, 2031 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG05B15/02
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
A prog analysis and execution system and method. The system includes a computer control system, an interface engine in communication with the computer control system, the interface engine being configured to receive prog information, and an action item development engine in communication with the control system, the action item development engine being configured to analyze received prog information and to determine corresponding action items. The system further includes a sensor engine in communication with the computer control system, the sensor engine being configured to receive input from at least one sensor for use in controlling a well drilling operation, and an operational equipment engine in communication with the computer control system, the operational equipment engine being configured to receive input from the computer control system and to control the well drilling operation in accordance with the determined action items in the prog.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.