Patent · US Active

Managing computing deployment in presence of variable workload

US8386995B2 · kind B2 · utility

20Cited by
7References
30Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 15, 2007
Grant dateFeb 26, 2013
Priority date
Expiry dateSep 22, 2030

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F11/008
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Automated or autonomic techniques for managing deployment of one or more resources in a computing environment based on varying workload levels. The automated techniques may comprise predicting a future workload level based on data associated with the computing environment. Then, an estimation is performed to determine whether a current resource deployment is insufficient, sufficient, or overly sufficient to satisfy the future workload level. Then, one or more actions are caused to be taken when the current resource deployment is estimated to be insufficient or overly sufficient to satisfy the future workload level. Actions may comprise resource provisioning, resource tuning and/or admission control.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.